Apr 28, 2026
Forsyths successfully delivered the fabrication, NDT and coating of brace clamps for another happy client, carried out from our Dyce facility.
A key element of the project was the Site Integration Testing, undertaken at the Forsyths fabrication yard which included detailed fit-up inspections of individual components and full assemblies, along with test lifting of clamp half-assemblies to validate rigging design. Upon successful completion of fabrication and testing, the finished components were prepared for transportation.
This project highlights Forsyths’ capability to deliver complex fabrication packages with integrated testing, ensuring reliability, safety and performance.
Upcoming events
At the events we attend, you can meet Forsyth Group directors and employees from a range of offices & backgrounds. We want to spread the word about Forsyths as much as possible. This is why we attend as many Distillation, Oil & Gas & Renewables events as possible. It is a great opportunity to meet existing and new clients.